Current time: 19/05/2024, 22:08 Hello There, Guest! (LoginRegister)

Post Reply 
Liverpool Lime Street to get an overhaul
RE: Liverpool Lime Street to get an Overhall
(03/04/2015 08:00)wirralbus Wrote:  Looking at the slideshow , it looks like the the lengthening of what at present is Platform 2 would block anything into Platform 1 hence it being removed .

Judging by those diagrams the gap between the existing Platforms 3 & 4 looks narrower than the gap between the lengthened Platform 2 and Platform 1. I don't think that the extension of Platform 2 will render Platform 1 inaccessible to the shorter length trains that use it at present

If a point was positioned at the existing edge of Platform 2 then Platform 1 could be retained for use by 2-car or 3-car Northern franchise services. Platforms 3 & 4 are accessed via a point from a single access track - so I don't see why something similar couldn't be used to keep Platform 1 operational after the rebuild
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Liverpool Lime Street to get an Overhall - SK15 GZG - 03/04/2015 15:58



User(s) browsing this thread: 1 Guest(s)