Hulleys of Baslow
|
|
||||||
RE: Hulleys of Baslow
(19/08/2021 05:48)knutstransport Wrote: If the Staffordshire CC listed stops really are the only stops it means it'll serve the airport viewing park but not the airport station!The Airport is not on the X1. From the AVP to Manchester, it runs as an X57 (and there are notices saying that on the timetable). At least one timetable is slightly wrong though as the times shown for the viewing park on Staffordshires timetable are the Airport Interchange times on the TSY timetable. I will be interested to see how well this goes as there isn't any layover in it. That can not be good as we have seen, the Snake Pass can shut and that shouldn't then affect a bus in Ashbourne. I think if the X1 takes off and they can afford it, possibly it will be the X1 from Ashbourne to Manchester, not interworking as this is one hell of a journey for any driver to do. 4 hours non stop. I hope it goes well and I think the route has potential if the promotion is on point. I just worry about the punctuality. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 2 Guest(s)