| 
				
				 
					Northern (Arriva Rail North)
				 
			 | 
		 
	 
	
		
	
		
			| 
				
			 | 
		 
		
			
				
					RE: Northern (Arriva Rail North)  
					 (26/09/2017 20:33)T42 PVM Wrote:  I see the Timetables for the North West are up now, must be a mistake on the Liverpool - St Helens Central/St Helens Junction one as says Buses finish about half 6 but its Rail Replacement anyway so should not be affected by the strike at all.. 
The replacement bus arrangement which apply for engineering works change on strike days.  The Mid-Cheshire line has the last Manchester bound train replaced by a bus next week but that late bus isn't operating on strike days.  However, earlier bus replacement services are operating which wouldn't have operated if there wasn't a strike.
				  
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	
		
			| 
				
			 | 
		 
		
			| 
				 
					RE: Northern (Arriva Rail North)   
					One thing which has had very little publicity, is that there will be a Preston-Ormskirk, and Wigan-Kirkby services operating on Sunday
				 
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	
		
			| 
				
			 | 
		 
		
			
				
					RE: Northern (Arriva Rail North)  
					 (30/09/2017 22:51)N271CKB Wrote:  One thing which has had very little publicity, is that there will be a Preston-Ormskirk, and Wigan-Kirkby services operating on Sunday 
It is directly connected to the Lime St blockade
				  
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	
		
			| 
				
			 | 
		 
		
			
				
					RE: Northern (Arriva Rail North)  
					 (30/09/2017 22:51)N271CKB Wrote:  One thing which has had very little publicity, is that there will be a Preston-Ormskirk, and Wigan-Kirkby services operating on Sunday 
Was no Preston to Ormskirk service a month or so ago when Merseyside Transport Trust had there open day as Burscough Station was closed.
 
This must be a new thing
				  
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	
		
			| 
				
			 | 
		 
		
			
				
					RE: Northern (Arriva Rail North)  
					 (02/10/2017 07:45)E208 WBG Wrote:  Was no Preston to Ormskirk service a month or so ago when Merseyside Transport Trust had there open day as Burscough Station was closed. 
 
This must be a new thing 
But there was when Ormskirk motorfest was on on the 27th August
				  
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	
		
			| 
				
			 | 
		 
		
			
				
					RE: Northern (Arriva Rail North)  
					Here's the new live signalling map with the 4th track and Roby and Huyton stations.
 http://www.charlwoodhouse.co.uk/rail/livesig/3
				 
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	
		
			| 
				
			 | 
		 
		
			| 
				 
					RE: Northern (Arriva Rail North)   
					Are trains to Lime Street diesel or electric this week. I had assumed diesel but the Engineering Access Statement doesn't make any reference to being blocked to electric traction, but does refer to a shuttle service, which I seem to recall was the original intention, with connections at Edge Hill?
				 
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	
		
			| 
				
			 | 
		 
		
			
				
					RE: Northern (Arriva Rail North)  
					 (10/10/2017 12:12)mikestone Wrote:  Are trains to Lime Street diesel or electric this week. I had assumed diesel but the Engineering Access Statement doesn't make any reference to being blocked to electric traction, but does refer to a shuttle service, which I seem to recall was the original intention, with connections at Edge Hill? 
All 319s apart from 1x156
				  
				
				
				
			 | 
		 
		
			| 
				
				
			 | 
		 
	
 
	 
	
	
		
	 
	
	
	
	
	
	
	
	
		
		
	 
	
	
User(s) browsing this thread: 39 Guest(s)
	
 
    
    
    
  
     
 
		 
			
 
     |