Stagecoach MCSL - Chester & Wirral Depots
|
|
||||||
RE: First Chester & Wirral
The problem with night buses is there isnt the market for them to operate all week and they can be a costly operation to have as the drivers are then unable to work during the day , hence usually where night buses operate there is some sort of outside funding provided . Im not sure about getting rid of the long established service 150 which has run in different guises for as long as know of , im led to believe the night tunnel bus was introduced as a result of the night ferries on the mersey disappearing with the advent of the Birkenhead Tunnel opening and has stayed in a way ever since. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 41 Guest(s)