| 
				
				 
					Stagecoach Manchester
				 
			 | 
		
				
  | 
		||||||
| 
				 
					RE: Stagecoach Manchester   
				
				
				
			Middleton is currently in no position to handle the hybids engineering wise; none of the staff have had training on them for starters. I believe the swap round of routes was supposed to have happened by now, but the collapse of Maytree has set that back somewhat. Don't quote me on this, but I believe that 40mph is the balancing speed of the motor - any higher and you need fairly complex electronics to divert the saturating field from the motor.  | 
		||||||
| 
				
	 
					« Next Oldest | Next Newest »
				 
			 | 
		
User(s) browsing this thread: 290 Guest(s)



