| 
				
				 
					Lancashire Triangle Electrification
				 
			 | 
		
				
  | 
		||||||
| 
				 
					RE: Lancashire Triangle Electrification   
				
				
				
			(27/04/2013 05:17)wirralbus Wrote: Is this going to be three or four lines through Roby and Huyton , dont seem to be able to tell at the moment . The initial plan is for three lines through Roby and Huyton, and when the hub is completed, then a fourth line (on the far disused platform) will be built IF DEEMED NECESSARY at that time. AFAIK this is not a definite at the moment. Interestingly, the two current lines will both be Liverpool bound, and the new third (and possible) fourth line will be Wigan/Manchester bound, completely different from the layout in BR days  | 
		||||||
| 
				
	 
					« Next Oldest | Next Newest »
				 
			 | 
		
User(s) browsing this thread: 6 Guest(s)



