| 
					TransPennine Express
				 | 
| 
 | ||||||
| 
					RE: First Transpennine Express   (22/10/2012 16:14)wirralbus Wrote: Are they replacing the switch and crossings on both sides of Stalybridge Station Re-signalling, 10mph line speed increase, junctions either end re-modelled, 2 extra platforms, station refurbishment, provision for electrification.... lots! New bays supposed to be able to hold 4-car Class 319. Signalling is swalloed up into the new super IECC, Manchester East. | ||||||
| 
					« Next Oldest | Next Newest »
				 | 
User(s) browsing this thread: 16 Guest(s)
 


 


