			The following is confirmed in (TRAMWAYS AND URBAN TRANSIT, LRTA) (SEPTEMBER 2012 897) Manchesters last big bang to begin in 2015 as follows:- Metrolink to be extended to the Trafford Centre Tram Trains to be used on Manchester - Atherton - Wigan/Manchester - Marple - Glossop and/ Manchester - Altrincham - Northwich using existing Metrolink lines between Manchester and Altrincham Didsbury to Hazel Grove, proposed as well as an Altrincham - Stockport line also using Tram-Trains. All of the T68 Fleet of trams will be withdrawn bvy 2014 following an order for a further 20 M500 trams at that stage the fleet will consist entirely of 94 M5000 Trams till Tram trains are delivered post 2015. The schemes will have a total cost of £1.5billion.  | 
		||||||
| 
				
	 