Transport for Wales Rail
|
|
||||||
RE: KeolisAmey Wales & Borders
(12/09/2018 10:11)DVG526 Wrote: Didn’t take long for the bad news that we already knew about to start rolling in. If the ludicrous decision to put them Underground things on the Crewe shuttle goes ahead this will compromise the timetable with their 65 mph top speed. Going to be some very tight turnarounds. It's actually a 60mph top speed and I don't think one has yet been tested at 60mph either so they are relying on computer simulations using a design specification. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 6 Guest(s)