| 
				
				 
					Northern (Arriva Rail North)
				 
			 | 
		
				
  | 
		||||||
| 
				 
					RE: Northern (Arriva Rail North)   
				
				
				
			(13/01/2018 21:33)Metroline1511 Wrote: On the thread about the delayed electrification via Bolton I kept getting a warped message about my post being too long. So, I shall make my point here. That's it the line through Bolton is ready by then! If it comes on stream in December, it will be precisely 2 years later than was originally planned.  | 
		||||||
| 
				
	 
					« Next Oldest | Next Newest »
				 
			 | 
		
User(s) browsing this thread: 38 Guest(s)



