Cheshire East proposed funding cuts
|
|
||||||
RE: Cheshire East proposed funding cuts
(20/10/2017 20:32)Nicholas Wrote: The route identifiers might be internal references, with the winning bidder able to choose the route number. A similar practise happened in Dorset - they tendered routes that they referred to as 1 to 7, however the operators were able to select what number was used (the same as existing in 5 out of 7). In this case they don't all have existing numbers due to part withdrawal of routes and the remaining sections being lumped together in to a new route. I imagine it's also possible some operators will look at the proposed replacement for a service they currently operate and think "we could provide a service at least as good as that on a commercial basis", as some operators have done in the past which then gives them more flexibility over timings, the exact route etc. |
||||||
« Next Oldest | Next Newest »
|
User(s) browsing this thread: 2 Guest(s)