Current time: 08/05/2024, 16:49 Hello There, Guest! (LoginRegister)

Post Reply 
Merseyrail
RE: Merseyrail
Any news on when 508140 will be taken away to Newport for scrap?
Presumably it will be going via rail from Birkenhead North depot, where it is currently based?
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
Timetable changes on the Southport, Chester and Ellesmere Port lines from Monday 3rd October, to ensure reliability during leaf-fall season.
An extra unit being added to the Chester circuit to increase turnaround time at Chester.
Chester trains still look not be calling at Green Lane or Bromborough Rake.
Withdrawal of the morning and evening peak extras on the Chester/Ellesmere Port line - a reflection of the shrinking fleet size and an additional 3 car unit being needed on the Chester line.
Looks as though the same number of units will run on the Southport-Hunts Cross diagrams.

https://www.merseyrail.org/plan-your-jou...anges.aspx
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(25/09/2022 11:13)508134 Wrote:  Timetable changes on the Southport, Chester and Ellesmere Port lines from Monday 3rd October, to ensure reliability during leaf-fall season.
An extra unit being added to the Chester circuit to increase turnaround time at Chester.
Chester trains still look not be calling at Green Lane or Bromborough Rake.
Withdrawal of the morning and evening peak extras on the Chester/Ellesmere Port line - a reflection of the shrinking fleet size and an additional 3 car unit being needed on the Chester line.
Looks as though the same number of units will run on the Southport-Hunts Cross diagrams.

https://www.merseyrail.org/plan-your-jou...anges.aspx

Doesnt the Southport line have an already healthy turn around time under normal circumstances at Southport , the extra minutes in the leaf fall timetable will just eat into that , the only problem will be if the units need to step up for a failure .

You just hope that between now and the first 777 comes along that nothing major happens to the fleet.
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(25/09/2022 11:06)508134 Wrote:  Any news on when 508140 will be taken away to Newport for scrap?
Presumably it will be going via rail from Birkenhead North depot, where it is currently based?

It will, yes.
It is now scheduled to be moved next Monday, problems with Sunday engineering works and pathing.
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(25/09/2022 11:13)508134 Wrote:  Timetable changes on the Southport, Chester and Ellesmere Port lines from Monday 3rd October, to ensure reliability during leaf-fall season.
An extra unit being added to the Chester circuit to increase turnaround time at Chester.
Chester trains still look not be calling at Green Lane or Bromborough Rake.
Withdrawal of the morning and evening peak extras on the Chester/Ellesmere Port line - a reflection of the shrinking fleet size and an additional 3 car unit being needed on the Chester line.
Looks as though the same number of units will run on the Southport-Hunts Cross diagrams.

https://www.merseyrail.org/plan-your-jou...anges.aspx

The majority of changes are on the Wirral.
The only change on the northern line is extra time on the Southport services (the 3 and 6 cars have not been altered)
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
Bit of an unusual one today....

https://www.wirralglobe.co.uk/news/22705...n-station/
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
The “short range” battery 777s will be numbered 777001 - 039/41/43/45/47/49/51/53.
The long range ones for Headbolt Lane will be 777140/42/44/46/48/50/52
I guess if in future more long range units are needed, they’ll be converted and renumbered from 7770xx to 7771xx
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
The other possibility is that they might be fitted with the modifications to make them long range from the get go which would suggest they will just be numbered in the 7771xx range when each unit is completed
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
(28/09/2022 17:47)313201 Wrote:  The other possibility is that they might be fitted with the modifications to make them long range from the get go which would suggest they will just be numbered in the 7771xx range when each unit is completed

Quite possibly so in due course
Find all posts by this user
Quote this message in a reply
RE: Merseyrail
The movement of 508140 has been rescheduled (again) to run late next Sunday


Update: 5Q42 22.55 Birkenhead North to Crewe South Yd is now on RTT.
It will go forward to Newport on Monday morning, carrying 508140 for scrapping
Find all posts by this user
Quote this message in a reply
Post Reply 




User(s) browsing this thread: 15 Guest(s)