Forum | Merseyside Dennis Dart Website
Merseyrail - Printable Version

+- Forum | Merseyside Dennis Dart Website (http://dartslf.com/forum)
+-- Forum: Other Transport (/forumdisplay.php?fid=9)
+--- Forum: Railways (/forumdisplay.php?fid=10)
+--- Thread: Merseyrail (/showthread.php?tid=36)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417


RE: Merseyrail - 507 mad - 03/01/2013 14:07

what unit was invoved at blundellsands and crosby and was the fire brigade involved at all?


RE: Merseyrail - wirralbus - 03/01/2013 14:15

No Fire brigade involvement , for some reason plastic bags seem to love being sucked into the Resistor Fans on the units , they may need to look at the design of the air intake .


Services have now resumed to Kirkby and Ormskirk after track circuit failed route locking the up line from Bank hall to Sandhills.


RE: Merseyrail - First Class - 03/01/2013 14:53

(03/01/2013 14:15)wirralbus Wrote:  No Fire brigade involvement , for some reason plastic bags seem to love being sucked into the Resistor Fans on the units , they may need to look at the design of the air intake .


Services have now resumed to Kirkby and Ormskirk after track circuit failed route locking the up line from Bank hall to Sandhills.

Even leaves and discarded litter end up in the resistor fans. The wire meshing protecting the vent is the problem, the mesh needs to be finer so not to let small things in.

Currently looks like this:

[Image: images?q=tbn:ANd9GcS-dI3eLljvTGe-tCDkipQ...lZaGvQYwMQ]

Needs this:

[Image: diamond_0020_mesh.jpg]


RE: Merseyrail - dave4jackie - 03/01/2013 20:02

(03/01/2013 14:07)507 mad Wrote:  what unit was invoved at blundellsands and crosby and was the fire brigade involved at all?

507006


RE: Merseyrail - MX12CFE - 04/01/2013 07:23

Is the resistor fan the wire mesh box thing under the cab with the letters LPA on it?


RE: Merseyrail - 507 mad - 04/01/2013 19:14

when trains have just had an undercarriage overhaul the shaft is red, its located under the disabled passenger door




happy new year


RE: Merseyrail - Its a hobby - 07/01/2013 07:17

James Street swap over today. Platform 1 back open as platform 3 closes.


RE: Merseyrail - 507 mad - 08/01/2013 18:53

was onboard 508126 today on the southport line, it sound really jumpy and rackertey. according to the chester cronicle and chester and chesire west council that the line between ellesmere port and helsby is in the future going to be operated by a PPM, the double track is to be split in two due to the freight services, it will use platform 2 at EP and a depot will be added along the route.


RE: Merseyrail - First Class - 08/01/2013 20:05

Will break my silence to advise the forum that it is seemingly expected (in the Network Rail Strategic Business Plan - London North Western), that Merseyrail will receive new rolling stock in the 3xx range (presumably a variant of the Electrostar family).

As a result of this, Network Rail will be facilitating the renewal of the obsolete mechanical train stops on Merseyrail with an alternative, compatible mechanism.

The infrastructure work to accommodate the new rolling stock will take place during Control Period 5.

Additionally, Network Rail may struggle to find the est. £17m to maintain Moorfields, and the £9m for Hamilton Square. Things like escalators, roofing and electrics are all nearing end of life.

In 2016, the Merseyrail DC power supplies (Shore Rd particularly) are expected to be replaced, (which may coincide with new, more powerful, rolling stock).

Merseyrail will also be billed for actual electricity usage on the new stock, rather than "estimated" usage. The trains will essentially have "meters" on them.


RE: Merseyrail - jtd508110 - 08/01/2013 23:58

I would laugh if "3xx" ended up to be something like "313"'s!!!

I hope they don't put stupid traction motors that sound like a UFO is landing on the new trains. That will be unbearable on the wirral loop or moorfields northern line platforms!!!

How long do you reckon the 507/8's have to go then?