Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417


RE: Merseyrail - First Class - 16/12/2012 02:17

The Dn & Up Canning Street Line at Rock Ferry is in the process of being re-instated.

It is (allegedly) maintained to operational standards, as in, you are supposed to be able to signal a train onto the line, but it has been signed temporarily out of use for a long time.

Over the next couple of weeks the vegetation will be completely removed and the some sections of track repaired.

Not too sure why, just down as listed as various possessions next year for "renewals".

Could be exploration/survery work on behalf of the likes of Merseytravel, but maybe also to do with Wirral Waters scheme?

For those with Sectional Appendix access, renewals are between ML729 (Hooton end of Rock Ferry station) and ML727 (Canning Street North).

Contractors are currently clearing vegetation in preparation.

Illustration (all credit to owner)
http://1.bp.blogspot.com/-O_ehP6uvpYs/TyfG9x1gfgI/AAAAAAAAGDU/sbxVH_OOROE/s1600/P1030421.JPG


RE: Merseyrail - wirralbus - 16/12/2012 08:17

I do wonder why as the line has been removed across a level crossing at the Mersey Docks / Network Rail Boundary as the road surface was in a bad state .

The Network Rail boundary is at the Rendel Street A5029 / Freeman Street Junction.

At one time there used to be a signal box there at that boundary point that had excellent award winning floral displays .


RE: Merseyrail - First Class - 16/12/2012 14:34

If they electrified the small section of line it would benefit the stabling arrangements for Merseyrail, as anything coming from Hooton direction to stable at Rock Ferry has to do a reversing movement in order to access Platform 3+4. It also obviously also gives you somewhere else to put a 6-car.

My thoughts are that it is simply Network Rail being forced to maintain the line in an operational condition or they have to sign it out of use and potentially pay compensation to any potential users, (which is usually Freight Operators who claim future flexibility is compromised). Also got to get permission from the ORR, at cost, who may still decline their application for closure.

Probably cheaper and easier to remove the vegetation and do a few welds than go through the above.

Wirral Waters may well be behind this, anyone know whether this line (to Bidston) would be of any use to them? Perhaps delivering building materials to site or even as a potential passenger service?

Network Rail Route Plans (Route O) Report states:

The large scale proposals at Birkenhead and Liverpool Docks if realised will create considerable demand for travel. From a rail perspective this presents a challenge as neither of these areas are currently rail served. The Wirral Waters development at Birkenhead Docks could be accessed by rail if the freight lines were re-opened.


RE: Merseyrail - wirralbus - 16/12/2012 15:14

It probably would with some relaying on the dock railway between Rendel street and Birkenhead North TMD be a better way of delivering building materials to Wirral Waters.

Coming via Bidston could hinder the regular train service though between Bidston and Birkenhead north and then any subsequent shunting.

Coming via Rock Ferry would also have its hinderances though with the 6 trains an hour during Monday to Saturday daytime , there now being only two workable paths an hour now , and then none available between 0730 - 0900 and 1600 and 1800 Monday to Friday as this when there is 8 trains an hour .


RE: Merseyrail - First Class - 16/12/2012 16:48

(16/12/2012 15:14)wirralbus Wrote:  It probably would with some relaying on the dock railway between Rendel street and Birkenhead North TMD be a better way of delivering building materials to Wirral Waters.

Coming via Rock Ferry would also have its hinderances though with the 6 trains an hour during Monday to Saturday daytime , there now being only two workable paths an hour now , and then none available between 0730 - 0900 and 1600 and 1800 Monday to Friday as this when there is 8 trains an hour .

Plenty of paths available to deliver on a Sunday or during the evening midweek (or even before 7am). Once Hooton signal box is closed, the Chester-Liverpool line is available 24hrs, (Chester PSB & Merseyrail IECC), subject to any planned possessions.


RE: Merseyrail - 507 mad - 16/12/2012 20:24

i dont know why merseyrail stopped running overnight stabling at platform 1 at hooton, the only trains since 2010 i've seen stabled there are 31's, 66's e.t.c while doing route learners. 508112 has been fitted with aircon


RE: Merseyrail - First Class - 16/12/2012 21:31

(16/12/2012 20:24)507 mad Wrote:  i dont know why merseyrail stopped running overnight stabling at platform 1 at hooton, the only trains since 2010 i've seen stabled there are 31's, 66's e.t.c while doing route learners. 508112 has been fitted with aircon

Hooton Platform 1 is still used for stabling.

2H02 23:30 Chester-Hooton and 5H37 23:41 Ellesmere Port-Hooton both stabled there last night. Both services run Saturdays Only from 15/12/2012 to 07/12/2013.

The unit(s) working the above, formed 5C08 (07:45 Hooton-Chester) this morning, and will run SuO from 09/12/2012 to 01/12/2013.

Plenty of disused stabling places, although some it is not electrified, (e.g. Hooton Run Round "Platform 0", still in use, Port Sunlight sidings, temp out of use, Birkenhead Central TMD, still in use, Rock Ferry Goods, temp out of use, Overpool Sidings, temp out of use).


RE: Merseyrail - CX06 EBK - 16/12/2012 21:43

Saw the Polar Express at James Street Platform 2 and also later being undecorated at Rock Ferry and later on moving back to Kirkdale.


RE: Merseyrail - 507022 - 16/12/2012 22:05

Hooton Platform 1 is still used for stabling.

After Christmas, when the Sunday 6 cars stop running, the other unit goes ECS to Ellesmere Port to work the 0749 back


RE: Merseyrail - jtd508110 - 17/12/2012 08:54

Both advertising liveried trains are on the Wirral line today. 508111 is on West Kirby's until the end of service and 507002 is on e.ports