Forum | Merseyside Dennis Dart Website
Merseyrail - Printable Version

+- Forum | Merseyside Dennis Dart Website (http://dartslf.com/forum)
+-- Forum: Other Transport (/forumdisplay.php?fid=9)
+--- Forum: Railways (/forumdisplay.php?fid=10)
+--- Thread: Merseyrail (/showthread.php?tid=36)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417


RE: Merseyrail - T42 PVM - 17/04/2021 10:04

Believe 507003 has had a small fire at Eastham Rake Station this morning.


RE: Merseyrail - 507022 - 17/04/2021 12:31

(17/04/2021 10:04)T42 PVM Wrote:  Believe 507003 has had a small fire at Eastham Rake Station this morning.

Yes, it looks like it was underneath, possibly on the shoe gear


RE: Merseyrail - 507022 - 20/04/2021 18:21

The next 777 to be brought over is due on 5 May.
It’s 002, one of the two at Wildenrath test track and it has “long range “ battery power as opposed to emergency battery power which the ones already in the UK have.


RE: Merseyrail - T42 PVM - 20/04/2021 19:42

(20/04/2021 18:21)507022 Wrote:  The next 777 to be brought over is due on 5 May.
It’s 002, one of the two at Wildenrath test track and it has “long range “ battery power as opposed to emergency battery power which the ones already in the UK have.

I assume that will be parked at Warrington?


RE: Merseyrail - wirralbus - 20/04/2021 21:31

(20/04/2021 19:42)T42 PVM Wrote:  I assume that will be parked at Warrington?

If 002 comes over with the heavier duty battery , one of the existing units will be moved probably to Warrington to make way for the testing that 002 will undertake with that battery.


RE: Merseyrail - 313201 - 21/04/2021 00:39

Would I be right in saying that depending on which line the testing was taking place, the 3rd rail power would be shut down so that the battery testing could take place or will the 3rd rail power be left on in case there was a problem with the battery system therefore allowing the unit to continue testing on the 3rd rail


RE: Merseyrail - wirralbus - 21/04/2021 07:45

It would be tested in two ways total isolation and with power in the third rail . They will need to be able to restart under the most extreme conditions in last mile set up from leeds Street Bank and the River Bed , two of the most steep climbs on the network .

The other climbs that will get looked at is the Green lane bank and the climb from Liverpool Central - St James (Baltic Triangle area)Hunts Cross bound .


RE: Merseyrail - 507022 - 21/04/2021 08:59

(20/04/2021 21:31)wirralbus Wrote:  If 002 comes over with the heavier duty battery , one of the existing units will be moved probably to Warrington to make way for the testing that 002 will undertake with that battery.

The loco will probably take one to Warrington after it’s dropped 002 off at Kirkdale as has happened on the last one or two deliveries.
The third rail will charge the batteries, which will give a range of about 30 miles - ideal for when the Merseyrail network expands (Burscough, Headbolt Lane or Skelmersdale)


RE: Merseyrail - iMarkeh - 21/04/2021 15:45

(21/04/2021 08:59)507022 Wrote:  The loco will probably take one to Warrington after it’s dropped 002 off at Kirkdale as has happened on the last one or two deliveries.
The third rail will charge the batteries, which will give a range of about 30 miles - ideal for when the Merseyrail network expands (Burscough, Headbolt Lane or Skelmersdale)
Is Headbolt Lane going to be electrified or will it be a battery operation?


RE: Merseyrail - 507022 - 21/04/2021 22:53

(21/04/2021 15:45)iMarkeh Wrote:  Is Headbolt Lane going to be electrified or will it be a battery operation?

The plan is to electrify it.